Storage Equipment for Woodstock Assembly Line

Authors

  • Mohd Asmedi Yaacob Department of Mechanical Engineering, Politeknik Sultan Azlan Shah 35950 Behrang Stesen, Perak, Malaysia
  • Baharuddin Mohd Zanggi Department of Mechanical Engineering, Politeknik Sultan Azlan Shah 35950 Behrang Stesen, Perak, Malaysia
  • Nurul Asyikin Yusri Department of Mechanical Engineering, Politeknik Sultan Azlan Shah 35950 Behrang Stesen, Perak, Malaysia

Keywords:

Manual material handling, material handling, cycle time, storage equipment

Abstract

This addition storage design proposal aims to improve the efficiency of the Woodstock production line by reducing cycle times through the implementation of new storage equipment and material handling systems. The current process is plagued by delays and inefficiencies in material handling, leading to longer cycle times and reduced productivity. The proposed design is expected to reduce cycle times by up to 10%, resulting in increased productivity and cost savings. In the proposed design for storage equipment and material handling, worker safety is of utmost importance. The use of tin shoulder, scissor, and air pressure gun can pose potential hazards to workers if not properly managed. Therefore, the design will incorporate several safety features to mitigate any risks. Overall, the new storage and material handling system will help the Woodstock production line remain competitive in the market and better serve customer demands.

Downloads

Download data is not yet available.

Downloads

Published

29-09-2023

How to Cite

Storage Equipment for Woodstock Assembly Line. (2023). Borneo Engineering & Advanced Multidisciplinary International Journal, 2(Special Issue (TECHON 2023), 140-147. https://beam.pmu.edu.my/index.php/beam/article/view/113

Similar Articles

1-10 of 35

You may also start an advanced similarity search for this article.